Industrializing nuclear energy

Factory-built nuclear 
Deployed offshore

Orkora is building the industrial base to deploy a worldwide fleet of standardized gigawatt-class nuclear power plants: built in one shipyard, moored far offshore.

OUTPUT
Gigawatt-class per platform
MANUFACTURE
Shipyard, class production
DEPLOYMENT
Offshore, worldwide
FLAG JURISDICTION
United States
01 — SCALE

Gigawatt scale
Ocean deployment

An Orkora platform hosts multiple reactors, grouped to deliver the output of a utility-scale nuclear power plant.

HULL MODEL · OCEAN BASIN TESTING · NORWAY 2026
02 — PROGRESS

Where we are

First hull and marine reactor system prototypes built and tested within six months of founding. The path from here runs through testing, licensing, manufacturing and the first platform.

Hull model, storm testingNORWAY · 2026
Non-nuclear reactor thermal testABERDEEN · 2026
Reactor test vesselABERDEEN · 2026
  1. 01COMPLETE
    Design and prototype
    Hull model tested in the ocean basin. Reactor thermal loop tested in Aberdeen.
  2. 02NOW
    Engineer and test
    Non-nuclear prototypes of the reactor, heat transport and power cycle.
  3. 03
    Licensing
    Nuclear site licensing for the shipyard and the platforms. Class approval for the hull.
  4. 04
    First platform
    First hull built, fueled and commissioned in the yard. Towed to station.
  5. 05
    The fleet
    Launch one platform every two years per dock. More docks, more platforms.